FREE RESOURCE · CONCRETE POUR DOCUMENTATION

Free Concrete Pour Report Template

Use this practical field template to organize a concrete pour from project setup through truck deliveries, testing, issues, photos and final handover.

FREE DOWNLOAD · NO EMAIL REQUIRED

Concrete Pour Report Template

Download the editable CSV starter template. It includes project/pour fields plus delivery, test, issue and evidence columns that can be opened in Excel, Numbers or Google Sheets.

Download free CSV template ↓

What the template covers

Project & pour

Project reference, pour name/location, date, supplier, mix reference, ordered quantity and unit system.

Deliveries

Ticket number, truck reference, volume, timing, temperature, status and notes.

Tests

Test type, result, unit, time, sample/specimen reference and notes.

Issues & evidence

Issue description, action taken, status, ticket-photo reference and general photo reference.

Concrete pour report field list

SectionRecommended recordWhy it matters
IdentityProject, reference, pour/element, dateDefines exactly what the report covers.
ConcreteSupplier, mix reference, ordered volumePreserves planned placement context.
DeliveryTicket, truck, volume, times, temperature, statusCreates truck-level traceability.
TestingTest, result, unit, time, sample referenceKeeps field results connected to the pour.
IssuesObservation, related delivery/location, action, statusPreserves exceptions and response.
EvidenceTicket image and site-photo referencesConnects source evidence to the written record.
CloseoutDelivered total, truck count, missing recordsSupports final completeness review.

How to use the template on site

  1. Set up the pour before placement. Enter project, location/element, supplier, mix reference and ordered quantity.
  2. Add one row per delivery. Keep the supplier ticket number as the primary delivery reference.
  3. Record tests when performed. Preserve result, unit and sample reference; do not invent acceptance criteria.
  4. Write issues as factual events. State what happened, what it related to and what action was taken.
  5. Reconcile before closeout. Check truck count, delivered quantity, expected tickets, tests, issues and photos.

For the full workflow, read How to Document a Concrete Pour.

Worked row example

TicketTruckVolumeTemperatureStatus
#842371#23715.0 yd³78°FDelivered

See the expanded Concrete Delivery Ticket Log example and the finished report structure.

Spreadsheet template vs. Concrete Pour Log

SpreadsheetConcrete Pour Log
Flexible manual rows and columnsPurpose-built project → pour → delivery workflow
Ticket images stored separately unless manually linkedPhotos stay with their related records
Manual completeness checkDocumentation completeness overview
Report assembled manuallyPro generates a structured PDF from saved entries

The free template is useful even if you never use the app. If you want to remove the manual assembly step, that is where Concrete Pour Log fits.

Template FAQ

Is the template free?

Yes. The CSV can be downloaded without providing an email address.

Is it an official inspection form?

No. It is a general field-documentation template. Use any project-mandated forms and requirements that apply to your work.

Can I edit it in Excel?

Yes. CSV files can be opened and edited in Excel, Apple Numbers and Google Sheets.

CONCRETE POUR LOG FOR IPHONE

Capture the record while the pour is happening.

Keep deliveries, ticket photos, tests, issues and site photos connected to one pour. Review documentation completeness and generate a structured PDF with Pro.

Download on the App Store →